최신 IBM Certifed Systems Expert 000-121 무료샘플문제:
1. An IT manager wants to directly attach disk for an AIX partition. There is no budget to acquire new disk. There are a number of idle disks in an IBM i partition that can be given to the AIX partition, but need to be reformatted.
What must the administrator use to reformat the disk for AIX?
A) System Management Services
B) Dedicated Service Tools
C) AIX Standalone Diagnostics DVD
D) Attended IPL from I_base_01 DVD
2. An administrator plans to use Live Partition Mobility on their two Power 740 systems. What is required for this environment?
A) IVM
B) VPM
C) AMM
D) VIOS
3. An administrator is planning to update a POWER blade server managed with Integrated Virtualization Manager (IVM) from version 1.5 to version 2.2
What should the administrator take into consideration?
A) The migration can only occur using a Serial Over LAN (SOL) console.
B) The partition profile data will need to be saved before the migration and restored once the migration is complete.
C) All client partitions should be shut down before starting the migration to avoid data corruption.
D) The administrator should use the Advanced Management Module (AMM) interface to specify the location of the migration DV
4. In order to suspend an IBM i partition1 which hardware resources need to be virtualized?
A) All networking resources
B) All resources
C) All SCSI resources
D) All disk resources
5. A customer has purchased a new BladeCenter H (BCH) and POWER blade to run IBM i. The POWER blade is configured with two Fibre Channel interlaces for attaching SAN and tape.
They have an IBM TS3500 tape library with a fibre channel connection, and current firmware is running through a fibre switch to another IBM i system. One port on the existing switch and one port in the BCH fibre switch has been zoned to provide a connection from the tape library to the BCH.
After IBM i 7.1 SLIC and base OS are installed on the blade from IBM distribution media, the tape library does not appear in the device configuration.
What is the most likely cause of the problem?
A) A switch-to-switch cable is required. A switch to device cable was shipped with the BCH by default.
B) NPIV enablement was omitted when configuring the BCH switch.
C) The BCH switch configuration must match the link speed of the TS3500.
D) The existing switch does not support NPIV.
질문과 대답:
질문 # 1 정답: C | 질문 # 2 정답: D | 질문 # 3 정답: C | 질문 # 4 정답: B | 질문 # 5 정답: D |