1. When installing NetCol5000-A35kW, how many kg of refrigerant are generally pre-filled?
A) 8
B) 5
C) 10
D) 12
2. The NetCol5000-C requires manual adjustment of the water valve to a minimum when it is filled with water.
A) True
B) False
3. You cannot search for an alarm by setting a filter condition on NetEco's Current Alarms page.
A) True
B) False
4. When the Huawei air-cooled air-conditioning compressor is turned on for the first time, the crankcase heating belt needs to be warmed up for more than ( ) hours.
A) 24
B) 12
C) 6
D) 2
5. Three sets of 9Ah battery packs are connected in parallel and connected to UPS2000-G-6kVA. What is the battery capacity set?
A) 27Ah
B) 9Ah
C) 32Ah
D) 18Ah
질문과 대답:
질문 # 1 정답: C | 질문 # 2 정답: B | 질문 # 3 정답: B | 질문 # 4 정답: B | 질문 # 5 정답: A |