최신 SAP Application Associate C_TSCM42_64 무료샘플문제:
1. What repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus generate Run Schedule Quantities (RSQ) from normal planned orders?
(Choose three.)
A) Using a planning algorithm from capacity planning.
B) Selecting a suitable repetitive manufacturing profile that contains an option for automatic line selection.
C) Manual assignment of planned production quantities in a planning table.
D) Automatic selection of the production version in material requirements planning (MRP) using Selection Methods setting.
E) Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP).
2. In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-based planning only, the planning table is to be used to plan this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material.
Which one of the following reasons for this message applies?
A) There are no planned orders or production orders present.
B) The series production indicator has not been set.
C) There are no requirements present.
D) There is no valid production version for this material.
3. A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?
A) Execution Steps (XSteps) and process messages
B) SAP Application Link Enabling (ALE)
C) Plant data collection (PP-PDC) interface
D) SAP Business Intelligence (BI)
4. Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)
A) Purchase orders for external operations or non-stock materials are deleted.
B) The order is no longer relevant for Material Requirements Planning.
C) Reservations are deleted.
D) Capacity requirements are deleted.
E) The order and its operations receive the system status Locked (LKD).
5. Which of the following efforts can be minimized using the KANBAN procedure?
A) Organizational effort to stage material
B) Organizational effort for capacity planning
C) Effort for master data maintenance
D) Effort for Sales and Operations Planning (SOP)
질문과 대답:
질문 # 1 정답: C,D,E | 질문 # 2 정답: D | 질문 # 3 정답: A | 질문 # 4 정답: B,C,D | 질문 # 5 정답: A |