최신 SAP Certified Application Associate C_IBP_2302 무료샘플문제:
1. What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
A) Specify a planning horizon in the planning area for each level of the assigned time profile.
B) Configure at most two input key figures on the same planning level in a key figure calculation.
C) Configure at least one calculated key figure for the planning area.
D) Assign the compound master data type and its component master data types.
2. You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
A) Finite heuristics can achieve demand prioritization and pegging.
B) Push and Pull production models are used by the optimizer.
C) Prioritization of demand elements one by one is achieved by unconstrained heuristics.
D) Planning results can be generated faster by the optimizer.
3. You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.
A) SOURCELOCATION
B) SOURCECUSTGROUP
C) SOURCECUSTOMER
D) SOURCEPRODUCTION
4. Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.
A) The attribute should be assigned to all planning levels.
B) The Business Meaning of the attribute has been specified.
C) The attribute belongs to a simple or compound master data type.
D) The attribute should be a non-key attribute of the master data type.
5. What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?
A) Ensure that the outsourced manufacturing locations have a separate subnetwork
B) Model target inventory and stocks at the outsourced manufacturing location
C) Use production lead times and offsets to manage components at the outsourced manufacturing location
D) Model relative production costs across internal locations and outsourced manufacturing locations
질문과 대답:
질문 # 1 정답: A,D | 질문 # 2 정답: A,B | 질문 # 3 정답: A,C | 질문 # 4 정답: C,D | 질문 # 5 정답: D |