1. What is industry best practice for ensuring that all equipment has been delivered to the site for an AV event?
Response:
A) One person should oversee everything
B) Selected equipment is matched to the shipping manifest
C) All equipment should be tagged
D) All delivery personnel should be assigned a color coded area
2. What piece of test equipment is used to assist in setting up an equalizer in a room?
Response:
A) Impedance bridge
B) VTG
C) Real Time Analyzer
D) Volt meter
3. In an electrical system, a ground fault is ___.
Response:
A) a continuous isolation between receptacles and electrical circuits
B) an electrical connection between any grounded conductor and any non-current-carrying metal object
C) an interruption of a cable shield connection
D) an electrically conductive area that has two or more ground reference connections
4. When mounting a 34kg (75lb) projector with a 7kg (15lb) mount, the substructure should be able to support a minimum weight of:
[Conducting Site Rough-In/First-Fix/Mount Substructure]
Response:
A) 41kg (90lb)
B) 122kg (270lb)
C) 82kg (180lb)
D) 204kg (450lb)
5. Which test verifies a signal can travel from one end of the cable to the other?
Response:
A) Polarity
B) Impedance
C) Continuity
D) Insulation