최신 IBM Certified Specialist C4120-783 무료샘플문제:
1. A customer is preparing to move their data and applications to a public cloud environment. They are going to use a provider's servers, storage and network resources, but will continue to manage the environment themselves. This is an example of which of the following?
A) Storage as a Service
B) Software as a Service
C) Business Process as a Service
D) Infrastructure as a Service
2. A customer wants to purchase a PureFlex solution with 10Gb network interfaces on a 32core Power node. Each virtual machine has a critical function and unplanned down time must be avoided. Which of the following provides the most resilient solution?
A) p460 server with one 10Gb chassis switch with the first switch activation upgrade
B) p260 server with one 10Gb chassis switch with the first switch activation upgrade
C) p460 server with two 10Gb chassis switches
D) p260 server with two 10Gb chassis switches
3. A PureFlex prospect has separate server, storage and network teams that communicate only through department managers. Which of the following requires the greatest communication and coordination between all three departments?
A) IEEE 802.3
B) NPIV
C) Fibre Channel
D) FCoE
4. A customer is considering a PureFlex Express. The customer wants redundant high speed Ethernet and redundant native Fibre Channel connections. Which of the following is the minimum number of switch bays required and number of switch bays remaining available for expansion?
A) 4 and 4
B) 2 and 4
C) 2 and 2
D) 4 and 0
질문과 대답:
질문 # 1 정답: D | 질문 # 2 정답: C | 질문 # 3 정답: D | 질문 # 4 정답: D |