최신 Certified Administrator C2090-310 무료샘플문제:
1. What is the minimum total storage needed for database creation?
A) 360 GB
B) 120 GB
C) 240 GB
D) 60 GB
2. Which two buttons on the Infrastructure Map can be used to determine network utilization of the top of rack switch?
A) Status view
B) Performance view
C) Temperature view
D) Default view
E) LED view
3. When using db2instance -list on a db2 pureScale cluster the following output is received: (Refer to the exhibit that appears below)
Which statement is NOT correct?
A) Group restart will be initiated if any failure occurs on the primary Cluster Caching Facility (CF).
B) This pureScale cluster has two members and two CFs. Each host has one member and one CF.
C) When a failure occurs on member 1, the in-flight data will remain locked until the problem on purenodel is fixed.
D) The restart light process on purenodeO has finished the Member Crash Recovery.
4. In the IBM PureData System for Transactions large configuration (full rack), the first chassis has two deployed medium size instances and the second chassis has two deployed medium size instances.
How many new large size instances can be deployed on this rack?
A) 1
B) 0
C) 3
D) 2
5. Which statement about the Database Conversion Workbench is NOT true?
A) Database Conversion Workbench can be used to convert client side application code to DB2.
B) Database Conversion Workbench can move data from one database to another database.
C) Database Conversion Workbench is a plug-in that can be installed into IBM Data Studio.
D) Database Conversion Workbench can be used to assess and help convert databases from other vendors to DB2.
질문과 대답:
질문 # 1 정답: D | 질문 # 2 정답: A,D | 질문 # 3 정답: C | 질문 # 4 정답: D | 질문 # 5 정답: B |