최신 VMware Professional 2V0-12.24 무료샘플문제:
1. An organization is looking to streamline its IT service delivery by automating the deployment of applications and infrastructure across its hybrid cloud environment.
Which VMware Aria Suite component should they use?
A) Aria Automation
B) Aria Operations
C) Aria Operations for Logs
D) Aria Operations for Networks
2. An administrator is responsible for monitoring the logs of multiple vSphere components using VMware Aria Operations for Logs. They notice an increase in error logs for a specific ESXi host.
Which two steps should be taken to pinpoint the issue? (Choose two.)
A) Check for patterns or repeated error messages over a specific time frame.
B) Delete all old logs to free up space and generate new logs.
C) Filter the loos by the ESXi host name and error severity.
D) Restart the ESXi host to resolve the issue immediately
E) Correlate the error logs with recent configuration changes on the ESXi host.
3. What is the recommended method for managing IP address allocation for VMware ESXi hosts in a VMware Cloud Foundation environment?
A) Static IP addresses assigned manually
B) Static IP address assigned using VMware NSX IP Pools
C) Dynamic IP addresses assigned via DHCP and without any reservations
D) Dynamic IP addresses assigned via DHCP with reservations
4. An administrator logged into NSX Manager to view host details. The administrator noticed that the "Tunnel" status for the ESXi hosts, in the VI workload domain, is showing down.
What is a possible reason the ESXi host tunnels are showing down in NSX?
A) The host TEP IP addresses are being dynamically assigned through DHCP instead of being statically assigned.
B) The overlay traffic is being blocked by the gateway firewall.
C) The IGMP has been disabled on the network.
D) The MTU setting for the host TEPs has been set to 1500.
5. An Administrator is tasked with setting up a new workload domain with VMware Cloud Foundation. The workload domain will have the following configuration:
vSphere with Tanzu to support Kubernetes workloads
NSX for container and virtual machine networking
Aria Operations will be configured for monitoring of the infrastructure Which three steps should be taken to complete the installation and configuration of this workload domain? (Choose three.)
A) Configure NSX segments for Kubernetes namespaces.
B) Enable workload management in vCenter Server.
C) Deploy the Supervisor Cluster for IaaS Control Plane.
D) Install Aria Operations agents on all ESXi hosts.
E) Integrate IaaS Control Plane with the existing vCenter Server.
질문과 대답:
질문 # 1 정답: A | 질문 # 2 정답: A,C | 질문 # 3 정답: B | 질문 # 4 정답: D | 질문 # 5 정답: A,B,C |