최신 Oracle Applications 1z1-244 무료샘플문제:
1. Exhibit.
In the Distribution Network, the RDC5 and RDC6 Regional Distribution Centers source material from the DC3 Central Distribution Center.
The matrix in the Exhibit shows allocation for a supply quantity of 300 In the first allocation bucket.
Which Fair Share Allocation method was applied by the Distribution Plan?
A) Current Demand Ratio
B) Demand Class
C) Order Size
D) Safety Stock Ratio
E) Fixed Percent
2. Identify the element that does NOT belong to a Demand plan from Oracle Demand Planning.
A) Category sets
B) Resources
C) Average discount
D) Bucket types
E) Calendars
F) Units of measure .
G) Quantities
3. You anticipate having a very large plan with many Items, Purchase Orders, and Sales Orders.
You want to plan at a detailed Item level as much as possible, but detailed Resource planning Is less Important.
Because your enterprise Is global. It Is Important to have the plan run In the shortest possible time.
Identify two aggregation settings that will help you achieve your goals.
A) Plan at the Item level In the short range and Product Family level in the long range.
B) Plan Individual Resources In the short term and aggregate Resources in the longer term buckets.
C) Plan your entire horizon in daily buckets to improve performance.
D) Plan your entire horizon in weekly buckets.
4. ABC Corporation uses a third-party configuration tool for booking their configured sales orders and creating a configured Bill of Material (BOM). This is a simple configuration process.
However, during the Implementation of Oracle E-Business Suite, the client installed Inventory, BOM, Work In Process (WIP), Engineering, Order Management, Receivables, and General Ledger modules. The SuperUser wants Oracle to be used for creating a configured BOM when a Sales Order Is created.
What would be your recommendation in this situation?
A) The client has to purchase "Oracle Configurator" and install it to achieve the above requirement.
B) Use the configurator option available in Order Management, which creates the configured BOM.
C) Execute the concurrent program "Populate Configuration Models," which creates the configured BOM.
Schedule it to run at a set frequency.
D) Create a BOM with type "Configuration" when a new sales order is booked.
5. Your client received some plan-related constraint exception messages. Identify two such messages.
A) Order causes supplier capacity overload
B) Order Is firmed early
C) Requirement causes resource overload
D) Requirement with insufficient lead time
E) Transportation volume constraint
F) Order lead time constraint
G) Requirement is firmed late
질문과 대답:
질문 # 1 정답: A | 질문 # 2 정답: D | 질문 # 3 정답: A,C | 질문 # 4 정답: D | 질문 # 5 정답: A,F |