최신 IBM Certified Specialist 000-604 무료샘플문제:
1. The zEnterprise Technical Specialist is talking with the customer support group. The customer technical staff has made several statements regarding their individual understanding of the cabling for zBX racks. Which of the following customer statements is incorrect?
A) All cables required to connect a zBX to a node are delivered by default.
B) All cables required to implement and connect a zBX to the customer environment (LAN,SAN) are delivered by default.
C) In order to connect a zBX correctly to a customer network detailed planning is necessary the evaluate the requirements (SFPs, cables)
D) All cables required to implement and connect a zBX to the customer environment (LAN, SAN) must be ordered separately
2. A large z196 installation is exploring its new capability to manage a large number of I/O devices. Which of the following functions best addresses the requirement?
A) Increased system I/O bandwidth to 288GB/s
B) Up to three subchannel sets per LCSS
C) Fixed size HSA
D) Doubled Hipersockets to 32
3. A banking customer is running z/OS 1.6 on a z9 EC, they plan to upgrade to z196. Which of the following should an IBM technical specialist review with the customer?
A) Order a new z196 and run the z/OS 1.6 unchanged
B) Migration of line of business z/OS applications to zBX
C) Verify capacity requirement on z196, and carry forward all features from z9 to z196
D) Verify capacity requirement, check the compatibility of the channels and upgrade z/OS 1.6 to a supported level
4. A System z customer has a new CIO. The CIO is concerned about continuous operations and recovery following a site catastrophe. Which of the following addresses this issue?
A) DR
B) Parallel Sysplex
C) CBU
D) GDPS
5. A System z customer is planning to move their data center with several existing System z servers to a new space without a raised floor. Which of the following requirements should the technical specialist discuss with the customer?
A) Confirm all the System z servers are z9 BC, z10 BC or z114
B) Ordering the height reduction feature if needed
C) Confirm the new installation is compliant with the Installation Manual for Physical Plugging
D) Top Exit Cabling Option is required for all the CPCs
질문과 대답:
질문 # 1 정답: D | 질문 # 2 정답: B | 질문 # 3 정답: D | 질문 # 4 정답: D | 질문 # 5 정답: A |